Replaced decking (flooring) and balusters (vertical retaining pieces under railing). In order to do this, we needed to replace a 5×5 beam, which included jacking the roof up to accommodate the beam.
Replaced existing vanity, flooring, and baseboard trim. Repaired drywall as needed.
Installed new Luxury Vinyl Plank (LPV) flooring and floor trim and replaced the toilet.
The client wanted cabinets rebuilt to make room for a dishwasher installed to the right of the sink.